• COMMERCIAL COMPLETED CONTRACTS

      Thomas Cook

      88 major sites from Plymouth to Scotland, including Wales, Jersey and Ireland.

      The installations consisted of a pole or floor mounted 42" LCD (with constantly moving content) screen in the front window, this required a new data outlet and 230v double socket outlet. The contract was completed at a rate of 10 screens per week, by two teams of electricians.


      Burnt Oak Library

      Complete rewire of the Library lighting and 230v power, also including new C.C.T.V, Paxton Door Access System, Wireless Fire Alarm, and Intruder Alarm to EN50131-1, PD6662:2004

      A flush floor 3 compartment trunking system was installed to supply 230v power to the desks and offices. Lighting was designed as a combination of surface and recessed luminaires, controlled via movement detectors. Sound Induction loops were installed in the meeting rooms and on the reception counter for the hard of hearing.


      Sotheby's

      The installation of a new standby generator 400v three phase mains infrastructure.

      The new generator was craned onto the roof and strategically placed. 400v three phase panel boards were located around the building. New Steel Wire Armoured cables were then run from the roof to the Panel Boards. The project required bespoke Mains/Generator changeover switches which were manufactured to our design.


      NSSL

      The installation of a new standby generator.

      The Generator was installed to help maintain the Electrical Supply to the building during power cut situations. Maintaining the IT infrastructure is critical to this Satellite business.

      Energy efficiency lighting survey.

      Following the survey, energy efficient, intelligent, dimming, daylight sensing luminaires were installed throughout the building. The result was a huge saving on the company’s energy bill.


      Silver Levene

      Refurbishment of No's. 37 & 38 Warren Street, London. Complete new Lighting, Power and Cat 5 Data installed.

      Lighting was high frequency 600mm x 600mm recessed and controlled via occupancy sensors, power was concealed within a plastic 3 compartment perimeter trunking system. Data installation was copper cable, flood wired with new Fibre Optic cables from the Communications Room on the 1st floor.


      Park Holidays

      Site rewire - Isle of Sheppey

      Following the annual testing of the caravan site, 52 Mobile Home pitches were rewired during the course of the winter shutdown period. New weatherproof I.P rated Mains Turrets with new Three Phase M.C.B. boards were installed in the middle of the fields, these were located on new concrete slabs and the pitch SWA sub main cables were run in trenches to the homes. 