Circuit Alert completed the following Contracts during 2008/9

 

Thomas Cook. 88 Major sites from Plymouth to Scotland including Wales, Jersey and Ireland. The installations consisted of a pole or floor mounted 42" LCD (with constantly moving content)screen in the front window, this required a new data outlet and 230v double socket outlet. The contract was completed at a rate of 10 screens a week by two teams of electricians.

Burnt Oak Library. Complete rewire of the Library lighting and 230v power, also including new C.C.T.V, Paxton Door Access System, Wireless Fire Alarm, and Intruder Alarm to EN50131-1, PD6662:2004. A flush floor 3 compartment trunking system was installed to supply 230v power to the desks and offices. Lighting is a combination of surface and reccessed luminaires controlled via movement detectors. Sound Induction loops were installed in the meeting Rooms and on the Reception Counter for the hard of hearing.  

Sotheby's. The installation of a new Standby Generator 400v Three Phase Mains infrastructure. The new Generator was craned onto the roof and strategically placed, 400v Three Phase Panel Boards were located around the building. New Steel Wire Armoured cables were then run from the roof to the Panel Boards. The project required bespoke Mains/Generator changeover switches which were manufactured to our design.    

Silver Levene. Refurbishmnet of No's. 37 & 38 Warren Street, London. All new Lighting, Power and Cat 5 Data installed, the lighting is High Frequency 600mm x 600mm receesed and controlled via occupancy sensors, power is concealed within a plastic 3 compartment perimeter trunking system. Data installation is copper cable, flood wired with new Fibre Optic cables from the Comms Room on the 1st floor.

Park Holidays. Isle of Sheppey. Following the Annual Testing of the Caravan site, 52 Mobile Home pitches were rewired during the course of the winter shutdown period. New weatherproof I.P rated  Mains Turrets with new Three Phase m.c.b. Boards were installed in the middle of the fields, these were located on new concrete slabs and the plot SWA sub main cables were run in trenches to the homes. 

 

 